Page:Item 4 1848.pdf/85

From Historical Hastings
This page has been proofread


more the practice to wait for special excursions. One of these was on the 9th of October, when 800 persons were conveyed from Hastings and St. Leonards per L.B. & S.C. railway.

An Historical Sketch. the following is extracted from the Iron Roads Dictionary of 1881.

On the 5th of June, 1839, a line of railway from London to West Croydon was opened for traffic under the auspices and control of a company known as the “London and Croydon”. Another company, incorporated as the “Croydon and Brighton”, constructed a line between those two places — via Red Hill, which was opened on the 1st of September, 1841. By the authority of an Act of Parliament, passed on the 27th of July, 1846, these two companies were amalgamated, and the undertaking then became that of the “London, Brighton and South Coast Railway Company”. The western section of the South-Coast line — from Brighton was opened for traffic as far as Chichester, on the 8th of June, 1846, and the Eastern section — from Brighton to Hastings — on the 27th of June, 1846. The extension from Chichester to Portsmouth was completed on the 14th of June, 1847. By the purchase of the Mid-Sussex Railway, in 1860, the London, Brighton and South-Coast Railway Company provided an alternative route to the South-Coast. The Mid-Sussex Company was incorporated by an Act, of Aug, 10th, 1857, to construct a line from the Brighton Company’s Railway at Horsham to Pulborough, again joining the Brighton Company’s system at that place, with a branch to Petworth. The Horsham and Dorking Company, incorporated by Act of parliament July 17, 1842, constructed the line between those two places. This company was amalgamated with the Brighton Company, by the powers of an Act passed in 1864, the latter Company having obtained parliamentary sanction in the previous year, 1863, for making a line between Dorking and Leatherhead. Between Leatherhead and Epsom the line was constructed by the South-Western Railway Company. These ​road​s thus gave direct communication with Portsmouth. The extension to Portsmouth Harbour, opened on the 2nd of October, 1876, greatly increased the facilities of access to the Isle of Wight. By the imminent purchase of the interests of the Portsmouth and Ryde Steam-packet Company and the completion of the Ryde Railway Pier, the Brighton Company became possessed of the readiest route from the Metropolis to the “Garden Island of the South Coast”. The L.B. & S.C. Company [now 1881] will shortly secure a third direct route to the South Coast, and one which will slightly decrease the distance to Newhaven Harbour. On the 6th of July, 1865, the Surrey and Sussex Railway Company was incorporated and authorized to construct a railway from Brighton Railway, south of their South Croydon station to their station at East Grinstead — length 24¼ miles. The works were commenced, but abandoned on the Surrey and Sussex being amalgamated with the Brighton Company by the provisions of an Act passed on the 12th of July, 1869. The Brighton Company Act of June 17th, 1878, conferred powers for renewing the abandoned works with certain modifications. The line thus formed will connect with another — 17½ miles -